Showing posts with label Power Shutdown :30-8-13. Show all posts
Showing posts with label Power Shutdown :30-8-13. Show all posts

Wednesday, August 28, 2013

Power Shutdown :30-8-13.

 Power supply will be suspended in the following areas on Friday between 9 a.m. and 5 p.m. Supply will be resumed before 5 p.m. if the work is completed.

Usman Road Area :
     Durai samy road, Lakshmi Narasimhar st, Usman road, North Usman road, Tanjore road, Griffith road, Vasan st, Gandhi st, Jawaharlal Nehru st, Cartrack road, Anandan st, Ramachandra st, Krishnan st, Krishnasamy st, Bazullah road, Chari st, Ramakrishna st, Thiyagaraya Gramani st, Gangai Amman koil st, Habibullah road, parthasarathy puram, Kolamamani Amman koil st, Balu Mudali st, Pillaiyar koil st, Kodambakkam high road, Vivekananda st, Mambalam high road, Rangan st, Rameswaram road, Unnamalai ammal st, Somasundaran st, Vysar st, Coats road, Murugesan st, Govindan st, Prakasam st,  Kannaiah st, Arulambal st, Rajan st, Lakshmanan st, Bhagirathi ammal st, Sarangabani st, Sadasivam st, Thirumoorthy st, Thirumalai pillai road, Thangavel st, Pinjala Subramanian st, Hanumantha Rao st, Rangachari st, Padmanaban st, Sambasivam st, Yogambal st, Singaram st, Raghavaiah road.

Pudhuthangal Area :
     Mullai nagar TNHB, Old State Bank colony, Mudichur road, Old Tambaram, Patel nagar, Irumbuliyur, Vaigai nagar, New State Bank Colony, T.T.K. nagar, Krishna nagar, Sakthi nagar, Kannadapalayam, Kishkintha road, Sai nagar, Sri Sai nagar, Reddiyar Palayam, Kalyan nagar, Melandai st, Kullakarai, Mangalapuram, Lakshmipuram.

Thirumudivakkam Area :
    Part of Kundrathur town, Thirumudivakkam Sidco Estate, Vazuthalambedu, Thirumudivakkam Village, Periyar nagar, Pazhanthandalam, Erumaiyur, Dhargas, Somangalam, Nallur, Naduveerapattu, Natham, Sirukalathur, Amarambedu, Varadharajapuram, Nadambakkam.

MEPZ Area :
     Entire MEPZ area.